Z 20 Bevel Gear

Solution Description: 
Z twenty Bevel Gear 

Principal Features:
Shape and Kind

Variety Material Surface area
Remedy
Accessories
Straight Kind
Straight
Bore
Straight
Bore+Tap
Keyway+Faucet
SM SMT KSMT 1045
Carbon Metal
Established CZPT
(4137 Alloy Steel Black Oxide)
SAM SAMT KSAMT Black Oxide
SB SBT KSBT  
SUM SUMT KSUMT 304
Stainless Steel
Set CZPT(304 Stainless Metal
CZPT CZPTT KCZPTT  Nickel Plating  
SUB SUBT KSUBT    

Bevel Gear
one. Make strictly in accordance with ANSI or DIN regular dimension
2. Substance: SCM 415 steel, SUS 304
3. Bore: Concluded bore

Product name Bevel Gear
Materials Available Stainless Steel, Carbon Metal or as your style
BORE Completed bore, Pilot Bore, Particular ask for
Processing Method Molding, Shaving, Hobbing, Drilling, Tapping, Reaming, Guide Chamfering, Grinding etc
Pressure Angle twenty Degree
Hardness 194HB or less
Dimensions CZPTer Drawings & ISO standard
Package Wood Scenario/Container and pallet, or created-to-buy
Certification CZPT:2008
Lead Time Inside 30 days right after get your payment

Specification:

Element Variety Shaft Bore Dia. PH7(1mm Increment) Amount
of Tooth
J B C D E F G H
Type Module Straight Bore
Straight Bore+Faucet
Keyway+Tap
Straight Bore
SM, SAM, SB
SUM, CZPT, SUB

Straight Bore+Tap
SMT, SAMT, SBT
SUMT, CZPTT
SUBT

Keyway+Tap
KSMT, KSAMT, KSBT
KSUMT, KCZPTT
KSUBT

one. six 8 twenty four.3 16 twenty 21.41 21 14.fifty three eleven.seventy one nine
six 8, 10 twenty five five.3 20 twenty five 26.41 23 fourteen.seven 11.21 8
8 eight, 10, 12 30 six.two 22 thirty 31.41 26 fifteen.89 eleven.seventy one 8.9
one.25 eight 10 20 six 22 twenty five 26.seventy seven 23 15.27 eleven.38 9
8 10, twenty five 7 25 31.25 33.02 28 17.88 thirteen.26 nine.twenty five
10 10, twelve, fourteen thirty eight thirty 37.5 39.27 36 23.forty seven 18.13 thirteen.five
1.five ten ten, 12 twenty six.eight 24 thirty 32.twelve 28 18.fifty three fourteen.06 10
10 ten~14 twenty five seven.five thirty 37.five 39.62 34 21.26 sixteen.31 eleven.five
twelve twelve~16 30 9.3 33 45 forty seven.twelve 38 22.eighty three sixteen.56 12.34
2. ten 12 sixteen 7 27 32 34.83 thirty 19 fifteen.41 eleven.five
12 12~14 twenty 8.5 34 40 forty one.32 37 24 18.41 fourteen
12 12~sixteen twenty five 10.five 42 50 51.33 40 23.34 16.forty one ten.99
12 twelve~18 thirty 12.4 44 sixty sixty one.36 51 30.seventy seven 22.forty one 16.seventy nine
2.five twelve fourteen 16 9 34 40 forty three.53 35 21 16.77 twelve
14 fourteen,16 20 twelve 42 fifty 53.fifty four 48 32.54 24.77 19
16 16~ twenty five 15 fifty sixty two.five 66.04 50 thirty.forty one twenty.52 twelve.five
16 sixteen~ 30 15 sixty 75 78.54 62 36.28 26.27 17
three fourteen sixteen sixteen 11 forty two forty eight fifty two.24 40 23 eighteen.twelve 13
16 16~ twenty 15 50 sixty sixty four.24 fifty eight 39.84 30.12 23
twenty twenty~ twenty five 20 sixty seventy five seventy nine.24 sixty 37.eighty one 24.62 fifteen
twenty twenty~ thirty twenty 70 90 ninety four.24 seventy five 45.forty seven 32.twelve 20

Packaging and Supply:

Packaging Polyethylene bag or oil paper for each merchandise
Pile on carton or as customer’s desire
Delivery of Samples By DHL, Fedex, UPS,  TNT, EMS
Lead time ten-15 working days as common, 30days in active season, it will dependent on the detailed get quantity.

FAQ:

Principal Marketplaces? North CZPTica, South CZPTica, CZPT CZPTpe , West CZPTpe , North CZPTpe, South CZPTpe, Asia
How to get? * You send out us drawing or sample
* We carry by way of undertaking assessment
* We give you our layout for your confirmation
* We make the sample and send out it to you right after you confirmed our layout
* You validate the sample then spot an get and pay out us 30% deposit
* We start off making
* When the goods is completed, you pay us the equilibrium following you verified photographs or monitoring quantities.
* Trade is carried out, thank you!!

Payment:  T/T
If you are interested in our products, you should inform us which supplies, sort, width, size u want.

Z 20 Bevel Gear