RV sequence Traits
- RV – Sizes:030-040-050-063-075-105-one hundred ten-one hundred thirty-a hundred and fifty
- Enter Choices: with enter shaft, With Square flange,With Input Flange
- Enter Electrical power .06 to 11 kW
- RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and above a hundred and ten in cast iron
- Ratios among five and 100
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium units are provided complete with artificial oil and permit for common mounting positions, with no need to have to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Size 030 and above are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, low/higher temperature oil, filling/drain/breather/stage plug,Tiny gap
Simple types can be used to a wide selection of electrical power reduction ratios from five to a thousand.
Warranty: One year from date of delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Variety: | ||||
Variety | Old Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Electrical power: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Input Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned military mould company, was proven in 1965. CZPTshine specializes in the total electrical power transmission solution for substantial-stop products producing industries dependent on the goal of “System Solution, Software Design and Specialist Support”.
CZPTshine have a powerful technological drive with more than 350 personnel at existing, such as above 30 engineering specialists, 30 top quality inspectors, covering an spot of 80000 square meters and varieties of CZPTd processing devices and testing equipments. We have a great foundation for the business software growth and service of higher-conclude pace reducers & variators owning to the provincial engineering technological innovation investigation heart,the lab of gear speed reducers, and the base of modern day R&D.
Our Staff
High quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Supply