JWB Series Pace Variator
1. Functions:
JWB-X type
- Sizes: ≥04
- Power up to 1.5 kW or much more
- Situations in RAL 5571 blue forged iron
- Shafts: scenario hardened and tempered steel.
- Inner components: warmth-taken care of steel
- Output velocity with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque price max 1002Nm
- CZPT, vibration-free of charge managing
- Bidirectional rotation
- Manage handwheel positionable on either aspect
- Slipping pace to max load at five%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
JWB-X B variety
- Sizes:01,02,03 and 04
- Energy up to 1.5 kW or significantly less
- Situations in die-cast aluminium alloy
- Shafts: scenario hardened and tempered steel.
- Internal parts: heat-treated steel
- Output speed with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque price max 795 Nm
- CZPT, vibration-totally free running
- Bidirectional rotation
- Manage hand wheel positionable on possibly side
- Slipping speed to max load at five%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
two. CZPT parameters
Variety | Output Torque | Output Shaft Dia. | Output Velocity Selection | 2rpm-950rpm | |
SWB01 | 2.six-1.6N.m | φ11 | Relevant Motor Electricity | .18kW-seven.5kW | |
SWB02 | 258-1.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Enter Possibilities | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Input Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Enter Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould business, was proven in 1965. CZPTshine specializes in the total energy transmission answer for substantial-conclude gear producing industries primarily based on the aim of “Platform Item, Application Design and Specialist Provider”.
CZPTshine have a powerful technical force with more than 350 personnel at present, which includes in excess of thirty engineering technicians, 30 quality inspectors, covering an spot of 80000 sq. meters and kinds of CZPTd processing equipment and tests equipments. We have a great foundation for the market software improvement and support of large-end velocity reducers & variators owning to the provincial engineering engineering study heart,the lab of equipment pace reducers, and the foundation of modern day R&D.
Our Group
Good quality Handle
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping