Variable Speed Variator for Glass CZPT

JWB Collection Velocity Variator 
one. Characteristics:

 JWB-X  type

  • Dimensions: ≥04
  • Power up to 1.5 kW or far more
  • Cases in RAL 5571 blue forged iron
  • Shafts: scenario hardened and tempered metal.
  • Inner parts: heat-dealt with metal
  • Output velocity with 4 pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque worth max 1002Nm
  • CZPT, vibration-free of charge operating
  • Bidirectional rotation
  • Control handwheel positionable on possibly side
  • Slipping pace to max load at five% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B variety

  • Measurements:01,02,03 and 04
  • Power up to 1.5 kW or significantly less
  • Instances in die-forged aluminium alloy
  • Shafts: circumstance hardened and tempered metal.
  • Inner components: warmth-taken care of metal
  • Output pace with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, eight-40r/min, 9-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque value max 795 Nm
  • CZPT, vibration-totally free running
  • Bidirectional rotation
  • Control hand wheel positionable on possibly side
  • Slipping velocity to max load at 5%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Type Output Torque Output Shaft Dia.   Output Pace Variety 2rpm-950rpm
SWB01 two.6-one.6N.m φ11 Relevant Motor Power .18kW-seven.5kW
SWB02 258-1.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Choices With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Input Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould enterprise, was recognized in 1965. CZPTshine specializes in the comprehensive electrical power transmission answer for higher-end tools producing industries based on the aim of “Platform Item, Application Design and style and Specialist Provider”.
CZPTshine have a powerful specialized power with above 350 personnel at existing, such as above thirty engineering experts, thirty quality inspectors, covering an region of 80000 square meters and varieties of CZPTd processing equipment and testing equipments. We have a very good basis for the sector software development and support of high-stop pace reducers & variators proudly owning to the provincial engineering technological innovation research middle,the lab of gear velocity reducers, and the foundation of contemporary R&D.

Our Staff

Good quality Manage
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

Variable Speed Variator for Glass CZPT