Top Grade Right Angle Helical Worm CZPT

S sequence CZPTcal Geared Motor Qualities

one. Features:

  1. Substantial performance: seventy five%-80%
  2. Large technology: the helical equipment and a worm gear mixed with an built-in transmission to enhance the torque and effectiveness.
  3. High precision: the gear is manufactured of high-good quality alloy steel forging, carbonitriding and hardening remedy, grinding procedure to make certain substantial precision and secure operating.
  4. Higher interchangeability: extremely modular, serial design and style, powerful versatility and interchangeability.

2. CZPT parameters
 

Ratio six.eight-288
Input power .twelve-22KW
Output torque eleven-4530N.m
Output velocity 5-206rpm
Mounting sort Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Strategy Flange input(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor
Brake Launch HF-handbook release(lock in the brake release placement), HR-guide launch(autom-atic braking placement)
Thermistor TF(Thermistor safety PTC thermisto)
TH(Thermistor defense Bimetal swotch)
Mounting Placement M1, M2, M3, M4, M5, M6
Sort S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing content HT200 substantial-strength cast iron from R37,forty seven,fifty seven,67,seventy seven,87
Housing substance HT250 Higher toughness solid iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening therapy
Solitary Phase Effectiveness seventy five%-eighty%
Lubricant VG220
Security Course IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould enterprise, was recognized in 1965. CZPTshine specializes in the total energy transmission answer for high-conclude gear manufacturing industries dependent on the intention of “System Solution, Application Design and Skilled Support”.
CZPTshine have a robust technical pressure with in excess of 350 workers at existing, like more than thirty engineering specialists, thirty top quality inspectors, masking an area of 80000 sq. meters and sorts of CZPTd processing devices and screening equipments. We have a very good basis for the market software growth and provider of large-end speed reducers & variators proudly owning to the provincial engineering technological innovation analysis centre,the lab of equipment velocity reducers, and the foundation of contemporary R&D.

Our Staff

Top quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping

 

Top Grade Right Angle Helical Worm CZPT