S Series Helical Worm Geared Motor with 380V

S collection CZPTcal Geared Motor Traits

one. Characteristics:

  1. Substantial performance: 75%-80%
  2. Substantial technological innovation: the helical gear and a worm gear merged with an built-in transmission to enhance the torque and efficiency.
  3. High precision: the equipment is made of substantial-top quality alloy steel forging, carbonitriding and hardening remedy, grinding process to ensure higher precision and stable managing.
  4. Substantial interchangeability: very modular, serial design and style, powerful versatility and interchangeability.

2. CZPT parameters
 

Ratio six.8-288
Enter electrical power .twelve-22KW
Output torque 11-4530N.m
Output pace 5-206rpm
Mounting sort Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Approach Flange enter(AM), shaft input(Ad), inline AC motor input, or AQA servo motor
Brake Release HF-manual launch(lock in the brake release place), HR-manual release(autom-atic braking position)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor safety Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Type S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing content HT200 higher-power cast iron from R37,forty seven,57,67,77,87
Housing materials HT250 Substantial power solid iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening therapy
Solitary Phase Effectiveness seventy five%-eighty%
Lubricant VG220
Safety Course IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould company, was established in 1965. CZPTshine specializes in the total power transmission resolution for higher-conclude products manufacturing industries based mostly on the intention of “Platform Solution, Software Design and Specialist Service”.
CZPTshine have a powerful complex drive with over 350 personnel at existing, which includes over thirty engineering professionals, thirty top quality inspectors, covering an region of 80000 square meters and sorts of CZPTd processing devices and tests equipments. We have a great foundation for the business software improvement and provider of substantial-finish velocity reducers & variators possessing to the provincial engineering technological innovation study centre,the lab of equipment speed reducers, and the base of present day R&D.

Our Crew

Good quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

seven. Certification.

Packing

Delivery

 

S Series Helical Worm Geared Motor with 380V