S sequence CZPTcal Geared Motor Characteristics
one. Functions:
- Large effectiveness: seventy five%-eighty%
- Higher technology: the helical equipment and a worm gear mixed with an built-in transmission to improve the torque and efficiency.
- High precision: the gear is made of higher-quality alloy metal forging, carbonitriding and hardening remedy, grinding approach to guarantee high precision and secure working.
- High interchangeability: very modular, serial layout, robust flexibility and interchangeability.
two. CZPT parameters
Ratio | six.eight-288 |
Enter electricity | .twelve-22KW |
Output torque | eleven-4530N.m |
Output velocity | five-206rpm |
Mounting sort | Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Approach | Flange enter(AM), shaft input(Advertisement), inline AC motor input, or AQA servo motor |
Brake Launch | HF-manual launch(lock in the brake launch position), HR-manual launch(autom-atic braking placement) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor security Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Kind | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing substance | HT200 large-energy cast iron from R37,47,57,67,77,87 |
Housing substance | HT250 Large energy forged iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment method |
One Phase Efficiency | seventy five%-eighty% |
Lubricant | VG220 |
Safety Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould company, was established in 1965. CZPTshine specializes in the total energy transmission solution for large-end tools production industries based mostly on the purpose of “System Solution, Application Style and Expert Service”.
CZPTshine have a sturdy technological force with over 350 personnel at existing, including above thirty engineering professionals, 30 top quality inspectors, masking an region of 80000 square meters and kinds of CZPTd processing machines and testing equipments. We have a excellent foundation for the sector application improvement and services of substantial-end velocity reducers & variators owning to the provincial engineering technologies study centre,the lab of equipment velocity reducers, and the base of modern day R&D.
Our Team
Quality Control
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
seven. Certification.
Packing
Supply