S Series Helical Worm AC Gear Motor

S series CZPTcal Geared Motor Attributes

one. Attributes:

  1. Substantial performance: seventy five%-80%
  2. High technology: the helical gear and a worm equipment mixed with an integrated transmission to improve the torque and performance.
  3. Large precision: the equipment is produced of high-high quality alloy metal forging, carbonitriding and hardening remedy, grinding method to make sure higher precision and secure working.
  4. Large interchangeability: highly modular, serial layout, robust flexibility and interchangeability.

two. CZPT parameters
 

Ratio 6.eight-288
Enter electrical power .twelve-22KW
Output torque 11-4530N.m
Output velocity five-206rpm
Mounting sort Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Approach Flange enter(AM), shaft enter(Advertisement), inline AC motor enter, or AQA servo motor
Brake Release HF-handbook launch(lock in the brake release position), HR-guide launch(autom-atic braking placement)
Thermistor TF(Thermistor protection PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Type S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing materials HT200 high-energy solid iron from R37,47,fifty seven,sixty seven,77,87
Housing substance HT250 High energy solid iron from R97 107,137,147,
157,167,187
Warmth treatment technology carbonitriding and hardening therapy
Single Phase Efficiency seventy five%-eighty%
Lubricant VG220
Security Course IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned army mould organization, was set up in 1965. CZPTshine specializes in the comprehensive power transmission resolution for higher-finish tools production industries primarily based on the purpose of “Platform Item, Application Style and Skilled Provider”.
CZPTshine have a powerful technological force with in excess of 350 personnel at present, including more than 30 engineering professionals, thirty quality inspectors, covering an region of 80000 square meters and varieties of CZPTd processing equipment and testing equipments. We have a great foundation for the business application improvement and services of high-end pace reducers & variators proudly owning to the provincial engineering technologies study heart,the lab of gear velocity reducers, and the base of present day R&D.

Our Staff

High quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

S Series Helical Worm AC Gear Motor