RV collection Attributes
- RV – Dimensions:030-040-050-063-075-one zero five-110-130-one hundred fifty
- Input Options: with enter shaft, With Square flange,With Enter Flange
- Input Electricity .06 to 11 kW
- RV-Size from 030 to 105 in die-solid aluminium alloy budy and in excess of a hundred and ten in solid iron
- Ratios between five and 100
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium units are provided complete with synthetic oil and enable for common mounting positions, with no want to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimension 030 and in excess of are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Alternatives: torque arm, output flange, oil seals, low/high temperature oil, filling/drain/breather/level plug,Small hole
Basic types can be applied to a vast range of power reduction ratios from 5 to 1000.
Guarantee: One year from day of shipping.
WORM GEARBOX | |||||
SNW SERIES | Output Velocity Selection: | ||||
Sort | Old Variety | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant Motor Electricity: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Input Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould organization, was recognized in 1965. CZPTshine specializes in the comprehensive electrical power transmission remedy for substantial-stop products manufacturing industries based mostly on the aim of “System Solution, Application Design and style and Professional Services”.
CZPTshine have a powerful technological power with over 350 staff at existing, which includes more than 30 engineering experts, 30 quality inspectors, masking an location of 80000 sq. meters and kinds of CZPTd processing equipment and testing equipments. We have a great foundation for the business application improvement and provider of substantial-end pace reducers & variators possessing to the provincial engineering technologies research centre,the lab of equipment velocity reducers, and the foundation of contemporary R&D.
Our Group
Quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Delivery