Run Smoothly Flange Mounting Speed Variator

JWB Sequence Speed Variator 
1. Attributes:

 JWB-X  type

  • Dimensions: ≥04
  • Power up to 1.5 kW or far more
  • Cases in RAL 5571 blue forged iron
  • Shafts: circumstance hardened and tempered steel.
  • Interior elements: warmth-dealt with metal
  • Output speed with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque price max 1002Nm
  • CZPT, vibration-free working
  • Bidirectional rotation
  • Management handwheel positionable on either facet
  • Slipping velocity to max load at 5% 
  • Regulation sensibility: ,five rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B sort

  • Dimensions:01,02,03 and 04
  • Energy up to 1.5 kW or less
  • Circumstances in die-cast aluminium alloy
  • Shafts: scenario hardened and tempered steel.
  • Inside elements: heat-handled steel
  • Output pace with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, nine-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque value max 795 Nm
  • CZPT, vibration-free managing
  • Bidirectional rotation
  • Handle hand wheel positionable on both aspect
  • Slipping pace to max load at 5%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Type Output Torque Output Shaft Dia.   Output Speed Range 2rpm-950rpm
SWB01 two.6-one.6N.m φ11 Applicable Motor Electricity .18kW-7.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Choices With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould company, was set up in 1965. CZPTshine specializes in the comprehensive electrical power transmission answer for higher-stop tools production industries based on the intention of “System Merchandise, Software Style and Professional Provider”.
CZPTshine have a sturdy specialized force with over 350 personnel at present, including over 30 engineering specialists, thirty high quality inspectors, masking an location of 80000 square meters and kinds of CZPTd processing devices and screening equipments. We have a good basis for the market software growth and services of high-end velocity reducers & variators proudly owning to the provincial engineering technological innovation research centre,the lab of equipment pace reducers, and the base of modern day R&D.

Our Group

Good quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.

Packing

Supply

Run Smoothly Flange Mounting Speed Variator