R series CZPTcal Geared Motor Attributes
1. Characteristics:
1. High efficiency: 92%-97%
two. Compact framework: Small offset output, two stage and three stage are in the exact same box.
three. High precision: the gear is manufactured of large-high quality alloy metal forging, carbonitriding and hardening treatment, grinding method to ensure higher precision and stable managing.
four. High interchangeability: highly modular, serial design and style, robust flexibility and interchangeability.
2. CZPT parameters
Ratio | 3.41-289.seventy four |
Input electricity | .12-160KW |
Output torque | 61-23200N.m |
Output speed | 5-415rpm |
Mounting kind | Foot mounted, flange mounted, foot and flange mounted, one-stage foot mounted, one stage flange mounted, Flange-mounted with extended bearing hub |
Enter Approach | Flange enter(AM), shaft enter(Advert), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-guide release(lock in the brake release placement), HR-handbook launch(autom-atic braking position) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Sort | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing content | HT200 large-energy forged iron from R37,47,57,sixty seven,77,87 |
Housing materials | HT250 Large strength cast iron from R97 107,137,147,157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment method |
Performance | 92%-ninety seven% |
Lubricant | VG220 |
Protection Class | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould enterprise, was set up in 1965. CZPTshine specializes in the comprehensive electricity transmission remedy for higher-stop gear manufacturing industries based mostly on the intention of “Platform Merchandise, Application Design and Expert Services”.
CZPTshine have a sturdy complex pressure with more than 350 workers at present, including more than 30 engineering professionals, thirty high quality inspectors, covering an spot of 80000 sq. meters and varieties of CZPTd processing devices and tests equipments. We have a great foundation for the business application advancement and service of large-end pace reducers & variators proudly owning to the provincial engineering technologies study center,the lab of gear pace reducers, and the foundation of modern day R&D.
Our Crew
Good quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
seven. Certification.
Packing
Supply