S sequence CZPTcal Geared Motor Attributes
one. Features:
- Higher effectiveness: 75%-80%
- Large technology: the helical gear and a worm gear merged with an integrated transmission to enhance the torque and effectiveness.
- High precision: the equipment is produced of substantial-quality alloy metal forging, carbonitriding and hardening treatment method, grinding process to make certain substantial precision and steady working.
- Higher interchangeability: very modular, serial design and style, strong flexibility and interchangeability.
two. CZPT parameters
Ratio | 6.eight-288 |
Input electrical power | .twelve-22KW |
Output torque | 11-4530N.m |
Output speed | five-206rpm |
Mounting type | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Method | Flange enter(AM), shaft input(Ad), inline AC motor input, or AQA servo motor |
Brake Release | HF-handbook release(lock in the brake release placement), HR-handbook launch(autom-atic braking place) |
Thermistor | TF(Thermistor protection PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Sort | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing substance | HT200 higher-strength forged iron from R37,forty seven,57,67,77,87 |
Housing substance | HT250 Substantial energy forged iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment |
One Phase Effectiveness | seventy five%-eighty% |
Lubricant | VG220 |
Defense Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned army mould business, was established in 1965. CZPTshine specializes in the full electrical power transmission resolution for high-end gear producing industries based mostly on the intention of “System Merchandise, Application Style and Professional Support”.
CZPTshine have a powerful specialized power with over 350 staff at present, such as above thirty engineering experts, 30 quality inspectors, covering an region of 80000 square meters and types of CZPTd processing devices and tests equipments. We have a excellent basis for the business software development and provider of substantial-stop speed reducers & variators owning to the provincial engineering technologies analysis center,the lab of equipment pace reducers, and the foundation of present day R&D.
Our Team
Quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
seven. Certification.
Packing
Delivery