F series Parallel Shaft-CZPTcal Geared Motor Attributes
1.Functions:
- Higher efficiency: ninety two%-94%
- Parallel output, compact construction, big output torque, smooth operation, minimal noise and long provider daily life.
- Substantial precision: the equipment is created of large-high quality alloy steel forging, carbonitriding and hardening treatment, grinding process to make sure higher precision and steady managing.
- High interchangeability: very modular, serial style, powerful flexibility and interchangeability.
2. CZPT parameters
Ratio | three.seventy seven-276.seventy seven |
Enter energy | .12-200KW |
Output torque | three.five-21700N.m |
Output speed | five-352rpm |
Mounting type | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Strategy | Flange input(AM), shaft enter(Advertisement), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-guide release(lock in the brake release place), HR-manual launch(autom-atic braking position) |
Thermistor | TF(Thermistor safety PTC thermisto) TH(Thermistor security Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Sort | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 higher-energy cast iron from R37,47,fifty seven,sixty seven,77,87 |
Housing materials | HT250 High toughness solid iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment method |
Efficiency | 92%-ninety four% |
Lubricant | VG220 |
Safety Course | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned military mould enterprise, was established in 1965. CZPTshine specializes in the complete electricity transmission solution for substantial-conclude products production industries based mostly on the purpose of “Platform Solution, Software Layout and Specialist Services”.
CZPTshine have a sturdy technological force with above 350 workers at current, which includes in excess of 30 engineering specialists, thirty top quality inspectors, covering an location of 80000 sq. meters and types of CZPTd processing machines and testing equipments. We have a very good foundation for the market software development and provider of higher-conclude speed reducers & variators possessing to the provincial engineering technologies study heart,the lab of gear pace reducers, and the foundation of modern day R&D.
Our Crew
High quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
seven. Certification.
All our merchandise get ISO & CE & UL certification.
Packing
Supply