RV series Qualities
- RV – Sizes:030-040-050-063-075-one zero five-one hundred ten-130-a hundred and fifty
- Input Possibilities: with input shaft, With Square flange,With Enter Flange
- Input Electricity .06 to 11 kW
- RV-Size from 030 to 105 in die-cast aluminium alloy budy and over 110 in solid iron
- Ratios among 5 and one hundred
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium units are supplied full with synthetic oil and enable for universal mounting positions, with no need to have to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimension 030 and over are painted with RAL 5571 blue
- Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Choices: torque arm, output flange, viton oil seals, low/substantial temperature oil, filling/drain/breather/stage plug,Small hole
Fundamental versions can be used to a vast assortment of power reduction ratios from 5 to 1000.
Warranty: One year from day of delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Velocity Assortment: | ||||
Variety | Previous Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant Motor Energy: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Input Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould company, was proven in 1965. CZPTshine specializes in the total power transmission solution for high-finish gear producing industries primarily based on the aim of “System Merchandise, Software Layout and Professional Service”.
CZPTshine have a strong specialized pressure with above 350 staff at present, like in excess of thirty engineering professionals, 30 quality inspectors, masking an spot of 80000 sq. meters and kinds of CZPTd processing equipment and screening equipments. We have a good foundation for the business software development and provider of large-finish velocity reducers & variators proudly owning to the provincial engineering technology analysis heart,the lab of gear pace reducers, and the base of modern R&D.
Our Crew
Top quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Delivery