RV collection Characteristics
- RV – Measurements:030-040-050-063-075-one hundred and five-a hundred and ten-a hundred thirty-a hundred and fifty
- Input Options: with enter shaft, With Sq. flange,With Enter Flange
- Input Electrical power .06 to 11 kW
- RV-Dimensions from 030 to 105 in die-cast aluminium alloy budy and above 110 in forged iron
- Ratios in between five and one hundred
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium units are equipped comprehensive with synthetic oil and enable for common mounting positions, with no need to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimension 030 and over are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, reduced/large temperature oil, filling/drain/breather/amount plug,Small hole
Basic types can be applied to a vast assortment of electrical power reduction ratios from five to 1000.
Guarantee: One year from date of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Velocity Range: | ||||
Variety | Old Type | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant Motor Energy: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould enterprise, was set up in 1965. CZPTshine specializes in the full electrical power transmission remedy for high-stop equipment manufacturing industries primarily based on the goal of “Platform Product, Software Style and Professional Support”.
CZPTshine have a powerful technical force with over 350 employees at existing, which includes above thirty engineering technicians, 30 good quality inspectors, masking an spot of 80000 square meters and sorts of CZPTd processing machines and tests equipments. We have a good foundation for the market application improvement and services of higher-conclude pace reducers & variators owning to the provincial engineering technologies analysis heart,the lab of gear velocity reducers, and the base of contemporary R&D.
Our Crew
Good quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Delivery