Good Quality Aluminum Material Speed Variators

JWB Sequence Speed Variator 
1. Attributes:

 JWB-X  type

  • Sizes: ≥04
  • Power up to 1.5 kW or much more
  • Situations in RAL 5571 blue solid iron
  • Shafts: case hardened and tempered metal.
  • Inner factors: heat-taken care of metal
  • Output pace with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque price max 1002Nm
  • CZPT, vibration-free managing
  • Bidirectional rotation
  • Handle handwheel positionable on either aspect
  • Slipping speed to max load at 5% 
  • Regulation sensibility: ,five rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B sort

  • Dimensions:01,02,03 and 04
  • Electricity up to 1.5 kW or less
  • Situations in die-cast aluminium alloy
  • Shafts: case hardened and tempered metal.
  • Interior elements: heat-handled metal
  • Output pace with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, nine-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque price max 795 Nm
  • CZPT, vibration-cost-free working
  • Bidirectional rotation
  • Management hand wheel positionable on either side
  • Slipping speed to max load at 5%
  • Regulation sensibility: ,five rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Sort Output Torque Output Shaft Dia.   Output Velocity Selection 2rpm-950rpm
SWB01 two.six-one.6N.m φ11 Applicable Motor Energy .18kW-7.5kW
SWB02 258-1.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Options With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Input Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Input Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould organization, was proven in 1965. CZPTshine specializes in the complete electricity transmission solution for substantial-stop equipment production industries dependent on the purpose of “System Merchandise, Application Layout and Specialist Provider”.
CZPTshine have a robust complex power with above 350 staff at existing, such as above 30 engineering technicians, thirty high quality inspectors, covering an region of 80000 sq. meters and kinds of CZPTd processing equipment and tests equipments. We have a excellent foundation for the business software growth and provider of higher-stop speed reducers & variators proudly owning to the provincial engineering technology study middle,the lab of gear velocity reducers, and the foundation of present day R&D.

Our Group

Quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

7. Certification.

Packing

Supply

Good Quality Aluminum Material Speed Variators