S collection CZPTcal Geared Motor Attributes
one. Features:
- Large effectiveness: 75%-80%
- Large technological innovation: the helical equipment and a worm gear blended with an built-in transmission to enhance the torque and efficiency.
- Large precision: the equipment is made of substantial-top quality alloy steel forging, carbonitriding and hardening remedy, grinding method to guarantee high precision and secure managing.
- Higher interchangeability: highly modular, serial style, strong flexibility and interchangeability.
2. CZPT parameters
Ratio | 6.8-288 |
Input electrical power | .twelve-22KW |
Output torque | eleven-4530N.m |
Output velocity | five-206rpm |
Mounting sort | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Method | Flange input(AM), shaft enter(Advert), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-guide launch(lock in the brake release position), HR-guide release(autom-atic braking situation) |
Thermistor | TF(Thermistor protection PTC thermisto) TH(Thermistor security Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Kind | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing materials | HT200 high-power forged iron from R37,47,57,sixty seven,seventy seven,87 |
Housing materials | HT250 Large energy forged iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment method |
Single Stage Performance | 75%-80% |
Lubricant | VG220 |
Defense Class | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould organization, was recognized in 1965. CZPTshine specializes in the complete electricity transmission answer for large-end gear production industries based mostly on the purpose of “System Merchandise, Application Design and Specialist Services”.
CZPTshine have a sturdy complex power with over 350 employees at current, which includes in excess of thirty engineering specialists, 30 quality inspectors, covering an area of 80000 square meters and types of CZPTd processing machines and screening equipments. We have a excellent foundation for the sector application growth and service of large-finish speed reducers & variators possessing to the provincial engineering engineering study middle,the lab of equipment pace reducers, and the foundation of contemporary R&D.
Our Group
Top quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
seven. Certification.
Packing
Supply