JWB Sequence Pace Variator
one. Attributes:
JWB-X type
- Sizes: ≥04
- Power up to 1.5 kW or far more
- Situations in RAL 5571 blue forged iron
- Shafts: circumstance hardened and tempered steel.
- Inner parts: heat-dealt with metal
- Output velocity with four pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque price max 1002Nm
- CZPT, vibration-cost-free managing
- Bidirectional rotation
- Management handwheel positionable on possibly aspect
- Slipping speed to max load at 5%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
JWB-X B variety
- Measurements:01,02,03 and 04
- Power up to 1.5 kW or much less
- Situations in die-solid aluminium alloy
- Shafts: situation hardened and tempered steel.
- Inner parts: heat-treated metal
- Output velocity with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque price max 795 Nm
- CZPT, vibration-totally free running
- Bidirectional rotation
- Management hand wheel positionable on either aspect
- Slipping speed to max load at five%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
2. CZPT parameters
Kind | Output Torque | Output Shaft Dia. | Output Pace Selection | 2rpm-950rpm | |
SWB01 | two.6-one.6N.m | φ11 | Relevant Motor Energy | .18kW-7.5kW | |
SWB02 | 258-one.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Input Choices | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Enter Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Enter Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould business, was set up in 1965. CZPTshine specializes in the total electricity transmission answer for substantial-finish equipment production industries based mostly on the purpose of “Platform Product, Software Layout and Skilled Service”.
CZPTshine have a sturdy complex power with in excess of 350 employees at current, like in excess of thirty engineering professionals, thirty quality inspectors, masking an location of 80000 sq. meters and varieties of CZPTd processing equipment and testing equipments. We have a good basis for the business software development and provider of large-finish speed reducers & variators owning to the provincial engineering technology study centre,the lab of equipment speed reducers, and the base of modern R&D.
Our Team
Top quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
seven. Certification.
Packing
Delivery