Compact Struction Aluminum Worm Gear Reducer

RV series Qualities

  • RV – Sizes:030-040-050-063-075-a hundred and five-110-130-a hundred and fifty
  • Enter Options: with input shaft, With Sq. flange,With Enter Flange
  • Input Electrical power .06 to 11 kW
  • RV-Dimension from 030 to 105 in die-solid aluminium alloy budy and above one hundred ten in forged iron
  • Ratios among 5 and a hundred
  • Max torque 1550 N.m and admissible output radial hundreds max 8771 N
  • Aluminium models are provided complete with artificial oil and enable for common mounting positions, with no need to have to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimensions 030 and more than are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Alternatives: torque arm, output flange, viton oil seals, low/substantial temperature oil, filling/drain/breather/amount plug,Modest hole

Standard designs can be used to a extensive variety of electricity reduction ratios from five to 1000.
Guarantee: One year from day of supply.

 

WORM GEARBOX          
SNW SERIES          Output Pace Range:
Variety Aged Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould organization, was proven in 1965. CZPTshine specializes in the complete electricity transmission remedy for large-conclude gear production industries based mostly on the intention of “System Solution, Application Style and Expert Provider”.
CZPTshine have a powerful technical power with more than 350 workers at present, such as above 30 engineering technicians, thirty top quality inspectors, masking an region of 80000 square meters and types of CZPTd processing machines and testing equipments. We have a very good basis for the market application improvement and support of large-finish pace reducers & variators proudly owning to the provincial engineering technology analysis middle,the lab of gear speed reducers, and the base of present day R&D.

Our Group

Good quality Handle
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Supply

Compact Struction Aluminum Worm Gear Reducer