Coaxial Output Cycloidal CZPT Withplanetary CZPT for Against Shock

CZPTshine CZPT Cycloid Geared Motor Characteristics

1. Functions:
1. Smooth running,lower sounds gear tooth needle much more engagement.
2. Cycloidal tooth profile supplies a higher contact ratio to face up to overload shocks
3. Compact dimensions: solitary ratio CZPT from 1/9 to 1/87, double stage up from 1/99 to one/7569 
four. Best for dynamic purposes: recurrent commence-stop-reversing duties satisfies for cyclo pace reducer because inertia is reduced
five. Lessen servicing costs: high reliability, extended daily life, minimum routine maintenance when compared to traditional gearboxes
6. Inside parts replaceable with other brand names to guarantee managing.

7. Grease Lubricated & Oil Lubricated Versions Accessible
8. Output Shaft Rotation Direction: Single Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Situations: Indoor Installation:ten-40 Celsius, Max eighty five% Humidity, Beneath 1000m Altitude, Nicely Ventilated Atmosphere, Cost-free of corrosive,        explosive gases, vapors and dust
ten.Sluggish Pace Shaft Course: Horizontal, Vertical Up & Down, CZPT Path
11.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Connection: Cyclo Integral Motor, Hollow Input Shaft Adapter
thirteen. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Capability Assortment: .37kW ~ 11kW

two. CZPT parameters

Type Aged Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned military mould business, was recognized in 1965. CZPTshine specializes in the total electricity transmission answer for substantial-end products producing industries based on the goal of “System Item, Software Layout and Professional Support”.
CZPTshine have a powerful technical pressure with in excess of 350 staff at present, which includes above thirty engineering experts, thirty good quality inspectors, masking an area of 80000 sq. meters and sorts of CZPTd processing machines and testing equipments. We have a good foundation for the sector software advancement and services of high-finish speed reducers & variators possessing to the provincial engineering engineering research heart,the lab of equipment pace reducers, and the foundation of present day R&D.

Our Group

Quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

Coaxial Output Cycloidal CZPT Withplanetary CZPT for Against Shock