RV series Attributes
- RV – Dimensions:030-040-050-063-075-one hundred and five-a hundred and ten-130-150
- Enter Alternatives: with enter shaft, With Sq. flange,With Input Flange
- Input Energy .06 to 11 kW
- RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and above a hundred and ten in forged iron
- Ratios between 5 and 100
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium models are provided comprehensive with artificial oil and allow for universal mounting positions, with no require to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimension 030 and above are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Options: torque arm, output flange, viton oil seals, low/substantial temperature oil, filling/drain/breather/stage plug,Small hole
Simple models can be applied to a extensive variety of power reduction ratios from 5 to a thousand.
Warranty: One year from date of delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Selection: | ||||
Type | Previous Variety | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant Motor Power: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was proven in 1965. CZPTshine specializes in the total electrical power transmission solution for large-finish gear production industries based on the aim of “Platform Solution, Application Style and Specialist Service”.
CZPTshine have a strong complex force with above 350 personnel at existing, which includes in excess of thirty engineering technicians, thirty good quality inspectors, covering an location of 80000 square meters and varieties of CZPTd processing devices and tests equipments. We have a excellent basis for the business application growth and provider of substantial-stop velocity reducers & variators possessing to the provincial engineering technology investigation heart,the lab of gear velocity reducers, and the base of present day R&D.
Our Crew
High quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Shipping and delivery