B Jxj Series Fail-Safe Reliability

CZPTshine CZPT Cycloid Geared Motor Characteristics

one. Functions:
1. Smooth managing,minimal sound equipment tooth needle much more engagement.
two. Cycloidal tooth profile provides a high get in touch with ratio to stand up to overload shocks
3. Compact size: one ratio CZPT from one/9 to one/87, double phase up from 1/99 to 1/7569 
four. Ideal for dynamic apps: recurrent commence-quit-reversing responsibilities fits for cyclo pace reducer since inertia is reduced
5. Minimize maintenance expenses: substantial reliability, lengthy daily life, minimal servicing compared to traditional gearboxes
6. Inside elements replaceable with other manufacturers to make certain managing.

7. Grease Lubricated & Oil Lubricated Designs Offered
eight. Output Shaft Rotation Course: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Circumstances: Indoor Installation:ten-40 Celsius, Max eighty five% Humidity, Underneath 1000m Altitude, Well Ventilated Setting, Free of charge of corrosive,        explosive gases, vapors and dust
ten.Gradual Velocity Shaft Direction: Horizontal, Vertical Up & Down, CZPT Direction
eleven.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Enter Link: Cyclo Integral Motor, Hollow Input Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Potential Selection: .37kW ~ 11kW

two. CZPT parameters

Sort Old Type Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould enterprise, was recognized in 1965. CZPTshine specializes in the complete power transmission resolution for higher-conclude equipment producing industries based mostly on the goal of “System Item, Software Design and style and Professional Support”.
CZPTshine have a robust specialized pressure with more than 350 workers at existing, like more than 30 engineering specialists, 30 top quality inspectors, masking an location of 80000 square meters and sorts of CZPTd processing machines and screening equipments. We have a good foundation for the business software advancement and services of substantial-conclude pace reducers & variators proudly owning to the provincial engineering technological innovation research centre,the lab of gear velocity reducers, and the base of modern day R&D.

Our Team

High quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

 

B Jxj Series Fail-Safe Reliability